Re: Progress report on my 64 Dodge project
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Progress report on my 64 Dodge project



 Part 3   I finally broke down an put a small air cond. in the shop
finished assembly on the engine and painted it and the bellhouse.
Bought a new Centerforce clutch set.  Took my two 4 speeds to a friend
for inspection. Both were very good. I ordred gaskets and seals from
Brewers. Just today I got a call that the tranny will be ready by the
weekend.  I am now waiting for another friend to come set the
bellhouse run-out with  the adjustable dowels.  Hopefully the engine
and tranny  install will be soon.  I pre fit everything and have all
the correct clutch linkage and clutch fork.
  This past weekend I overhauled the steering colume and today
installed it and installed the dash guage assembly. .I have been
waiting for a list member to contact me about a voltage limiter that
he was looking for , but I gave up on him. Saturday I took it to a
local RadioShack store  had the mechanical guts taken out of it and a
resister instaled  to cut the voltage to the guages.  I had called Joe
Suchy, but at this time he did not have any. . I ordered some other
parts from him , and I say he is a top notch person to deal with.
Non- better.
  It sure takes a lot longer to put a car together than to take it
apart. . Like a Rolls Royce-- each part finised and installed by
hand , one part at a time!
  My goal is to have it moving under it's own power before the first
snow-- and it is below freezing at night here!....................MO

On Oct 9, 12:41 am, MO <mic...@xxxxxxxxxxxxxxx> wrote:
>  Part 1   I don't know where I was on the project last time I
> updated.  Last Spring I got the body all straightened, primed and the
> hood, door openings, and trunk lid painted on the inside and edged.
> The two doors will be done later.  Frame connectors welded in. Dual
> Master cylinder installed. Dash painted white on the underside to make
> it easier to see the wireing. Dash installed.  Clutch and brake pedal
> assembly painted and installed.  Front windshield installed
> temporarily - new one and gasket later.  ..............MO

-- 
-- 
--
Please address private email -- email of interest to only one person -- directly to that person. That is, email your parts/car transactions and negotiations, as well as other personal messages, only to the intended recipient. Do not just press "reply" and send your email to everyone using the general '62-'65 Clubhouse public email address. This practice will protect your privacy, reduce the total volume of mail and fine-tune the content signal to Mopar topic. Thanks!

1962 to 1965 Mopar Clubhouse Discussion Guidelines:
http://www.1962to1965mopar.ornocar.org/mletiq.html and http://www.1962to1965mopar.ornocar.com/general_disclaimer.html.
-- 
You received this message because you are subscribed to the Google Groups "The 1962 to 1965 Mopar Mail List Clubhouse" group.
http://groups.google.com/group/1962to1965mopars?hl=en.





Home Back to the Home of the Forward Look Network


Copyright © The Forward Look Network. All rights reserved.

Opinions expressed in posts reflect the views of their respective authors.
This site contains affiliate links for which we may be compensated.