IML: 62 Front End Rebuild
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

IML: 62 Front End Rebuild



Hi all;  I did the Complete Front-End on my 62 Imp. this last spring/summer.  I am a 56 year old tool & die maker at (Daimler) Chrysler Engine Plant. I got my apprenticeship in May of 68.   I've also done 90% of my car repairs over the years (except Auto Trans & Warranty Work)  mostly on  Mopars.  BELIVE Me unless you have got a serious list of the right tools Don't try this at home!  The Most Fun was the Lower control arm Bushing. I never knew could speak several foreign languages till trying to get the torsion bars back in! The 400-500 $ is cheap for that much work.  Best of luck finding all the parts.  I spent 5 months watching on E-Bay to get every thing but the Inner tie rods (Moog ES-669 & 670) & the legendary 1672980 Center Link (Moog ES-599) . 
 Best of Luck to all!
Dave Van Buren  
1962 White Imperial Custom


Home Back to the Home of the Forward Look Network


Copyright © The Forward Look Network. All rights reserved.

Opinions expressed in posts reflect the views of their respective authors.
This site contains affiliate links for which we may be compensated.