RE: Spring Relocation
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: Spring Relocation



[AD removed for archives]
-------------------------------------------------------------------
Is your computer freezing up or slowing down?
Repair corrupt files and harmful errors - protect your PC
Take a 2-minute PC health check-up at no charge!
caadOuabOyW3Na/PC PowerScan
-------------------------------------------------------------------

Wow ... good stuff, Earl.

So if I am reading this right, I leave the stock hangers in position, 
hold the new hanger next to it (after I cut an opening in the frame 
rail), and mark the bolt hole.  I pull the new hanger down and drill it, 
then place it back up there and hold in in place with the threaded stock 
while I tack it in place?

In the BigBlockPart page they just cut away one side of the frame rail 
... did that work for you?

Doesn't sound too awful, but I might just take you up on your offer to 
chat on the phone ... 

Thanks!

Jim Jablonski
Royal Oak, Michigan
'64 Fury

Earl Helm wrote:
> 
> Guys I understand how you feel. The first one I did got me all twurped 
> out
> also.
> Here are a couple of hints. I know you might not understand this until 
> you
> have 
> finished your project, but try to. Little known fact one, It does not 
> matter
> where 
> the box goes in the frame, as long as it is the same on both sides - 
> side to
> side - 
> and it is far enough back and up for the spring to fit without binding. 
> What
> "does 
> matter" is where the hole is in the box. Believe it or not, this is the 
> easy
> part.
> If one box is a bit higher in the frame or a bit further back it is no 
> be
> deal as 
> long as you drill the hole for the spring in the right place. Since the
> stock hangers 
> can be mounted up while your trial fitting the box before welding, (the 
> only
> thing 
> that is important with the trial fit is that it is square and parallel 
> to
> the frame) you 
> can mark the hole location with the stock frame hangers and a 9/16 bolt 
> thru
> the 
> hole in the stock hangers. Once you have them marked, drill the hole, 
> drill
> it square thru both sides,
> then get some 9/16 threaded stock, cut it off about 14" long, put it 
> thru
> the hole in 
> the box, then thru the stock hanger, and bingo, you box is in the right
> place front 
> to back. Then make sure the box is right side to side, and tack weld it.
> Then finish 
> welding you box into place and hang your springs. This is way easier to 
> do
> than 
> to explain. If you have any questions, ping me off line, or call me. I 
> will
> be glad
> to help. Making a card board pattern the same size as your box, and 
> marking
> the 
> frame before cutting makes it easy. Cut it smaller than your pattern, 
> and
> grind to 
> fit. 800-688-3234
> 
> Earl
> 

[AD removed for archives]
-------------------------------------------------------------------
Get $1000.00 Overnight! Fast and Easy!
No Credit Checks! Many Lenders are 100% Paperless!
Let The Wizard Find the right Lender for you!
caadOutbOyW3Nf/911PaydayAdvance
-------------------------------------------------------------------

----
Please address private mail -- mail of interest to only one person -- directly to that person.  I.e., send parts/car transactions and negotiations as well as other personal messages only to the intended recipient, not to the Clubhouse public address. This practice will protect your privacy, reduce the total volume of mail and fine tune the content signal to Mopar topic.  Thanks!

'62 to '65 Mopar Clubhouse Discussion Guidelines:
http://www.1962to1965mopar.ornocar.org/mletiq.html. 



bOyW3N.








Home Back to the Home of the Forward Look Network


Copyright © The Forward Look Network. All rights reserved.

Opinions expressed in posts reflect the views of their respective authors.
This site contains affiliate links for which we may be compensated.