Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)



Then you and Kevin can upload all the Interim Reports for Card-SW and Card-1, All 4 sections.

As soon as you do into the DSABox, I will sign off both those Inspection Cards.

Thank you, 
David C Hurd


On Nov 7, 2023, at 2:20 PM, Brian Ely <brianely@xxxxxxxxxxxxxxxxx> wrote:



Hi David,

We received what we needed from Rob Andrews.  We will work on closeout for the projects.

 

Brian Ely

Construction Services Manager

Mid Pacific Engineering, Inc.

6310 State Highway 273

Anderson, California 96007

530-246-9499 ph | 530-246-9527 fax

 

West Sacramento, California

916-927-7000 ph | 916-372-9900 fax

 

Commitment to Service | One Team | Opportunity | Integrity

 

From: DAVID HURD <davidchurd@xxxxxxx>
Sent: Tuesday, November 7, 2023 2:18 PM
To: Brian Ely <brianely@xxxxxxxxxxxxxxxxx>
Cc: Kevin Sorensen <kevin@xxxxxxxxxxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; jeremy.polak <jeremy.polak@xxxxxxxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Understood for you Section 4 report.  But you still should upload Card-SW & Card-1, Sections 1, 2 & 3.please do that.

 

The same is true for Kevin Sorensen.  Please upload Card-SW & Card-1, Setuins 1, 2 & 3.

 

Thank you,

 

David C Hurd

 



On Nov 7, 2023, at 1:47 PM, Brian Ely <brianely@xxxxxxxxxxxxxxxxx> wrote:



Perfect, thank you. 

 

Brian Ely

Construction Services Manager

Mid Pacific Engineering, Inc.

6310 State Highway 273

Anderson, California 96007

530-246-9499 ph | 530-246-9527 fax

 

West Sacramento, California

916-927-7000 ph | 916-372-9900 fax

 

Commitment to Service | One Team | Opportunity | Integrity

 

From: Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>
Sent: Tuesday, November 7, 2023 1:44 PM
To: Brian Ely <brianely@xxxxxxxxxxxxxxxxx>; DAVID HURD <davidchurd@xxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>
Cc: jeremy.polak <jeremy.polak@xxxxxxxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Brian, this was already sent out to you.  See the attached letters and email from DSA.

 

Kevin R. Sorensen, SE

Streamline Engineering & Design, Inc.

8445 Sierra College Blvd., Suite E

Granite Bay, CA 95746

kevin@xxxxxxxxxxxxxxxxx

916.660.1930 (ph)

916.770.9267 (cell)

916.660.1941 (fax)

 

From: Brian Ely [mailto:brianely@xxxxxxxxxxxxxxxxx]
Sent: Tuesday, November 07, 2023 1:38 PM
To: DAVID HURD <davidchurd@xxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>
Cc: jeremy.polak <jeremy.polak@xxxxxxxxxxxxxx>; Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

We need to receive documentation that the change in mounting hardware has been accepted by DSA before we can upload conforming reports.

 

Thanks,

 

Brian Ely

Construction Services Manager

Mid Pacific Engineering, Inc.

6310 State Highway 273

Anderson, California 96007

530-246-9499 ph | 530-246-9527 fax

 

West Sacramento, California

916-927-7000 ph | 916-372-9900 fax

 

Commitment to Service | One Team | Opportunity | Integrity

 

From: DAVID HURD <davidchurd@xxxxxxx>
Sent: Tuesday, November 7, 2023 9:38 AM
To: Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>
Cc: jeremy.polak <jeremy.polak@xxxxxxxxxxxxxx>; Kevin Sorensen <kevin@xxxxxxxxxxxxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

I’m signing off on Maywood and Corning US today.  

 

Woodson I will do as soon as you are done with all the work and Mid-Pacific uploads their Reports for Card-SW and Card-1, Section 4.

 

FYI

 

David C Hurd

 

 

On Nov 7, 2023, at 8:29 AM, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx> wrote:



Hello Jeremy,

 

Good Day to you.

 

Please fond attached ATP document draft for reference.

 

Thank you,

Ganesh

 

From: Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx>
Sent: Tuesday, November 7, 2023 8:49 PM
To: Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>; Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>; DAVID HURD <davidchurd@xxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>
Cc: Matt Jardin <mjardin@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

 

CAUTION: This is an external email. Please be very careful when clicking links or opening attachments. See the URL nok.it/ext for additional information.

 

Good Morning, Ganesh, you had stated some time back that you could provide an example of what a close out consists of for Nokia. We have sign off for Maywood Middle School, Corning High School and Woodson Elementary (pending Mid-Pacific documentation) and I would like to try to get a head start on finalizing the closeouts.

 

@Brian Ely, what documentation will be needed from your team signing off on the engineering inspections associated to this project? Please let me know if there is anything you need from me.

 

Thank you,

 

 

 


<image001.png>

Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Date: Thursday, November 2, 2023 at 4:04
PM
To: Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>, Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx>, DAVID HURD <davidchurd@xxxxxxx>, Brian Ely <brianely@xxxxxxxxxxxxxxxxx>
Cc: Matt Jardin <mjardin@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>, onavarro <onavarro@xxxxxxxxxxxxxxxx>
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

Thank you all for taking this forward.

 

Regards.

 

From: Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>
Sent: Thursday, November 2, 2023 1:15 PM
To: jeremy.polak <jeremy.polak@xxxxxxxxxxxxxx>; DAVID HURD <davidchurd@xxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>
Cc: Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

 

CAUTION: This is an external email. Please be very careful when clicking links or opening attachments. See the URL nok.it/ext for additional information.

 

Jeremy, no this is not required.  The letters will suffice as accepted by DSA.  Please proceed as I specifically indicated the M12 to M8 change and all related details accordingly in the three separate PE letters sent out.

 

Kevin R. Sorensen, SE

Streamline Engineering & Design, Inc.

8445 Sierra College Blvd., Suite E

Granite Bay, CA 95746

kevin@xxxxxxxxxxxxxxxxx

916.660.1930 (ph)

916.770.9267 (cell)

916.660.1941 (fax)

 

From: Jeremy Polak [mailto:jeremy.polak@xxxxxxxxxxxxxx]
Sent: Thursday, November 02, 2023 1:13 PM
To: Kevin Sorensen <
Kevin@xxxxxxxxxxxxxxxxx>; Andrews, Robert@DGS <Robert.Andrews@xxxxxxxxxx>; DAVID HURD <davidchurd@xxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>
Cc: Sean Ettehadieh (Nokia) <
sean.ettehadieh@xxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; sean.eetehadieh@xxxxxxxxx
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Kevin, are you able to produce new CD's that reflect this change as the field inspectors will require this on site. Thank you,


From: Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>
Sent: Thursday, November 2, 2023 3:10 PM
To: Andrews, Robert@DGS <
Robert.Andrews@xxxxxxxxxx>; DAVID HURD <davidchurd@xxxxxxx>; Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>
Cc: Sean Ettehadieh (Nokia) <
sean.ettehadieh@xxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; sean.eetehadieh@xxxxxxxxx <sean.eetehadieh@xxxxxxxxx>
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Thank you very much for your consideration Rob!  That is exactly how I felt with them being so small and light, so I really appreciate it!  I would have done a complete CCD had the antennas not been so small.  Thanks again and take care!

 

David/Jeremy/Brian, please wrap this up ASAP based on the approved letters accordingly.  Thank you!

 

Kevin R. Sorensen, SE

Streamline Engineering & Design, Inc.

8445 Sierra College Blvd., Suite E

Granite Bay, CA 95746

kevin@xxxxxxxxxxxxxxxxx

916.660.1930 (ph)

916.770.9267 (cell)

916.660.1941 (fax)

 

 

 

From: Andrews, Robert@DGS [mailto:Robert.Andrews@xxxxxxxxxx]
Sent: Thursday, November 02, 2023 1:03 PM
To: Kevin Sorensen <
Kevin@xxxxxxxxxxxxxxxxx>; DAVID HURD <davidchurd@xxxxxxx>; Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx>
Cc: Sean Ettehadieh (Nokia) <
sean.ettehadieh@xxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; sean.eetehadieh@xxxxxxxxx
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Hi Kevin,

 

Technically a CCD would be needed. However, since these are light weight and the wind load is small, the letters are sufficient and the M8 fasteners are acceptable. The lab and PI can verify the M8 installation per the values on the details.

 

Rob Andrews
District Structural Engineer

 

916-764-0913 cell
916-445-2252 office
robert.andrews@xxxxxxxxxx

<image002.png>

 

From: Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>
Sent: Thursday, November 2, 2023 8:19 AM
To: DAVID HURD <
davidchurd@xxxxxxx>; Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx>; Andrews, Robert@DGS <Robert.Andrews@xxxxxxxxxx>
Cc: Sean Ettehadieh (Nokia) <
sean.ettehadieh@xxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; sean.eetehadieh@xxxxxxxxx
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

CAUTION: This email originated from a NON-State email address. Do not click links or open attachments unless you are certain of the sender’s authenticity.

 

Removing contacts as requested.

 

All, I reached out to Rob about this and asked if a letter would suffice due to the very minimal weight for these antennas.  I am pending a response to my email.  Thank you.


Rob, please advise if the attached PE letters will suffice for these projects, or if you need additional documentation.  Thank you!

 

Kevin R. Sorensen, SE

Streamline Engineering & Design, Inc.

8445 Sierra College Blvd., Suite E

Granite Bay, CA 95746

kevin@xxxxxxxxxxxxxxxxx

916.660.1930 (ph)

916.770.9267 (cell)

916.660.1941 (fax)

 

From: DAVID HURD [mailto:davidchurd@xxxxxxx]
Sent: Thursday, November 02, 2023 8:06 AM
To: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>
Cc: Sean Ettehadieh (Nokia) <
sean.ettehadieh@xxxxxxxxx>; Lorin Gredler <lgredler@xxxxxxxxxxxxxxxx>; Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>; Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>; David Bowen (Nokia) <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; James <James@xxxxxxxxxxxxxxxxx>; James Soares <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; Randal May (Nokia) <randal.may@xxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; Robert Andrews <robert.andrews@xxxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Kevin:

 

It appears after further review that since the DSA approved Structural Sheets S-2, Detail 7, for Maywood Middle School, Detail 8 for Corning High School and Detail 9 for Woodson Elementary all call out different mounting hardware has been supplied and installed and an unapproved substitution was made. 

 

Being that this is a Structural Safety item, a DSA-140-A, CCD appears to be the route you need to take in order for the plans, the material ESR and the site work to all be in agreement and approvable.  That is how it appears with the latest information now provided.

 

I suggest that you discuss this with Rob Andrews first to find out which is the next move you must make for reaching the simplest resolution for the new item.

 

FYI

 

David C Hurd

 

 

On Nov 2, 2023, at 6:51 AM, Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx> wrote:



All , Good Morning,

 

I just wanted to loop everyone in on the progress for Woodson Elementary School yesterday.

 

We were scheduled for Mid-Pacific torque testing at Maywood, due to a number of factors that took much longer than anticipated. The mounting hardware for the antenna mounts was not the correct size per the CD so there was some conflict with getting signed off. We came to the agreement that Mid Pacific would observe the torque spec for the smaller hardware but would not be able to sign off until the changes were made to the CDs. Kevin and David were set to work on a solution that you hopefully result in a simple revision that would not require DSA review and approval.  All of this is to say, we called off the torque testing until the CDs reflect the current hardware and moved on to Woodson as we were beginning to run short on time with the crane needed to stand the monopole.

 

Woodson Monopole has been erected and one sector antenna has been installed. We have scheduled Mid Pacific out today at 10am to observe the installation and torque testing of the footings for the ice bridge as well as the data rack in the IDF room. We will continue to move forward with the installation per the project plan previously issued and will keep everyone abreast to the outcome of the needed revisions to the CDs on behalf of the torque testing at all 3 sites of the radio and antenna equipment.

 

If you have any questions or concerns we are able to address within this group of either myself or any other stakeholders, feel free to share.

 

Thank you and have a great day, we will have an EOD update to you again late this evening or tomorrow morning,

 

 



 

Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Date: Wednesday, November 1, 2023 at 6:54 PM
To: Lorin Gredler <
lgredler@xxxxxxxxxxxxxxxx>, David Hurd <davidchurd@xxxxxxx>, Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx>, Kevin Sorensen <kevin@xxxxxxxxxxxxxxxxx>
Cc: Matt Jardin <
mjardin@xxxxxxxxx>, Brian Ely <brianely@xxxxxxxxxxxxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James <james@xxxxxxxxxxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>, onavarro <onavarro@xxxxxxxxxxxxxxxx>, Robert Andrews <robert.andrews@xxxxxxxxxx>
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

Team,

 

Lets start a new thread here. Relevant people are:

 

David Hurd davidchurd@xxxxxxx

Jeremy.polak jeremy.polak@xxxxxxxxxxxxxx

Kevin Sorensen kevin@xxxxxxxxxxxxxxxxx

Matt Jardin mjardin@xxxxxxxxx

Brian Ely brianely@xxxxxxxxxxxxxxxxx

Ganesh Babu (Nokia) ganesh.babu@xxxxxxxxx

Heather Igarta higarta@xxxxxxxxx

Octavio Navarro  onavarro@xxxxxxxxxxxxxxxx

Christian Zeno  czeno@xxxxxxxxxxxxxxxx

Robert Andrews robert.andrews@xxxxxxxxxx

Sean Ettehadieh sean.eetehadieh@xxxxxxxxx

 

Kindly use this list going forward.  

 

From: Lorin Gredler <lgredler@xxxxxxxxxxxxxxxx>
Sent: Wednesday, November 1, 2023 4:37 PM
To: David Hurd <
davidchurd@xxxxxxx>; jeremy.polak <jeremy.polak@xxxxxxxxxxxxxx>; Kevin Sorensen <kevin@xxxxxxxxxxxxxxxxx>
Cc: Matt Jardin <
mjardin@xxxxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>; Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>; David Bowen (Nokia) <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; James <james@xxxxxxxxxxxxxxxxx>; james <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; Randal May (Nokia) <randal.may@xxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; Robert Andrews <robert.andrews@xxxxxxxxxx>
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

 

CAUTION: This is an external email. Please be very careful when clicking links or opening attachments. See the URL nok.it/ext for additional information.

 

Hi All

 

 

I think I have been added to these emails chains by accident I am not part of this project.

 

 

Mr. Lorin Gredler

Project Manager/Systems Designer

Infinity Communications and Consulting Inc.

661 716 1840 Ext#517|Office

661 487 3374|Mobile

lgredler@xxxxxxxxxxxxxxxx

Follow Us On: LinkedIn | YouTube | Twitter

 

Infinity Website

 

 

From: David Hurd <davidchurd@xxxxxxx>
Sent: Wednesday, November 1, 2023 4:34 PM
To: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>; Kevin Sorensen <kevin@xxxxxxxxxxxxxxxxx>
Cc: Matt Jardin <
mjardin@xxxxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>; Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>; david.bowen <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; James <james@xxxxxxxxxxxxxxxxx>; James Soares <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; Randal May (Nokia) <randal.may@xxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; Lorin Gredler <lgredler@xxxxxxxxxxxxxxxx>; Robert Andrews <robert.andrews@xxxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Correction:

 

DSA-140-B no formal CCD to DSA.

 

DSA-140-A, then a CCD is required.'

 

 

 

On Wednesday, November 1, 2023 at 04:31:07 PM PDT, David Hurd <davidchurd@xxxxxxx> wrote:

 

 

Kevin:

 

I do not speak for DSA.  If this falls into the category of being a DSA-B.  I believe no CCD is required to be submitted to DSA for review and approval.

 

However, if this falls under the category of being a DSA-140-A, then it would require a CCD be submitted.  Anything that is falls under the Structural Safety, Fire Life Safety or, Access Compliance, then a CCD is required.

 

My thoughts on that,

 

David C Hurd

 

 

On Wednesday, November 1, 2023 at 01:58:24 PM PDT, Kevin Sorensen <kevin@xxxxx> wrote:

 

 

Jeremy/David, can this be simply presented as an RFI with a clarification request rather than revising the drawings for this revised mounting that was never provided to us?  Please advise as I do not have any exception to this and this installation and testing can proceed with the M8 bolts and hardware as specified.  I would not think this would require a full CD revision and CCD.  Please advise.I 

Kevin R. Sorensen, SE

Streamline Engineering & Design, Inc.

8445 Sierra College Blvd., Suite E

Granite Bay, CA 95746

kevin@xxxxxxxxxxxxxxxxx

916.660.1930 (ph)

916.770.9267 (cell)

916.660.1941 (fax)

 

From: Jeremy Polak [mailto:jeremy.polak@xxxxxxxxxxxxxx]
Sent: Wednesday, November 01, 2023 1:35 PM
To: Kevin Sorensen <
Kevin@xxxxxxxxxxxxxxxxx>; DAVID HURD <davidchurd@xxxxxxx>
Cc: Matt Jardin <
mjardin@xxxxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>; Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>; David Bowen (Nokia) <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; James <James@xxxxxxxxxxxxxxxxx>; James Soares <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; Randal May (Nokia) <randal.may@xxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; onavarro <onavarro@xxxxxxxxxxxxxxxx>; Lorin Gredler <lgredler@xxxxxxxxxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Kevin, we are having issue with a discrepancy for the torque testing torque spec on the antenna mounting hardware vs what is listed in the Construction Drawing.

 

Page S-2 Detail 7 for Maywood,  S-2 Detail 8 for Corning HS and S-2 Detail 9 for Woodson all call for M12 mounting hardware however the appropriate mounting kit for pipe 2 3/8”uses M8 mounting hardware. We are asking for the adjustment to be made on all 3 drawings for Mid-Pacific to sign off as torque compete. They will observe the M8 hardware torque spec at this time but will only offer sign off once the CD’s have been updated. Please review the clip from the CDs’. I have also attached the manufacturers installation manual for reference of “not to exceed” 14NM or 10 ft lbs.

 

Thank you for your assistance and hope to resolve this issue as soon as possible.

 

 

<image002.png>

 

 

 

 

 

 

 



 

Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>
Date: Friday, October 13, 2023 at 10:33 AM
To: DAVID HURD <
davidchurd@xxxxxxx>, Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx>
Cc: Matt Jardin <
mjardin@xxxxxxxxx>, Brian Ely <brianely@xxxxxxxxxxxxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James <James@xxxxxxxxxxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>, onavarro <onavarro@xxxxxxxxxxxxxxxx>, Lorin Gredler <lgredler@xxxxxxxxxxxxxxxx>
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

All, good morning and Happy Friday!  We just received the DSA approval for the CCD004.  Please proceed with the inspections and construction and let us know when everything is wrapped up so we can close all three projects out accordingly.  Thank you!

 

Kevin R. Sorensen, SE

Streamline Engineering & Design, Inc.

8445 Sierra College Blvd., Suite E

Granite Bay, CA 95746

kevin@xxxxxxxxxxxxxxxxx

916.660.1930 (ph)

916.770.9267 (cell)

916.660.1941 (fax)

 

From: DAVID HURD [mailto:davidchurd@xxxxxxx]
Sent: Friday, October 06, 2023 4:02 PM
To: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>
Cc: Kevin Sorensen <
Kevin@xxxxxxxxxxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>; Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>; David Bowen (Nokia) <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; James <James@xxxxxxxxxxxxxxxxx>; James Soares <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; Randal May (Nokia) <randal.may@xxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Jeremy:

 

I hope this finds you doing well.

 

I know you don’t have the DSA approved CCD-4 yet so schedule that monopole footing pour. That would only effect one day for me.

 

I now have a finalized concrete pour Calendar schedule for us to work around.

 

I have very large Concrete pours that will occupy my time on just those days as far as any other concrete pour like yours.

 

10/7/23 - tomorrow Saturday 

10/10/24

10/13/23

10/18/23

10/20/23

10/25/23

10/27/34

11/3/23

 

These dates would only affect the one day footing pour and are at 4:00 AM each day. I can do all the other required inspections for Woodson Antenna project on the days I do not have the mega concrete pours and after the pour the same day.  

 

Once we do that Woodson pour, there will be no time crunching for me..  

 

FYI

 

David C Hurd

 

 

On Oct 4, 2023, at 6:53 AM, Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx> wrote:



Thanks Kevin!

 

 



 

Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>
Date: Wednesday, October 4, 2023 at 8:52 AM
To: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>, DAVID HURD <davidchurd@xxxxxxx>
Cc: Matt Jardin <
mjardin@xxxxxxxxx>, Brian Ely <brianely@xxxxxxxxxxxxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James <James@xxxxxxxxxxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

All, good morning.  The latest CCD004 has been uploaded to Bluebeam for DSA review.  I will let DSA know this is uploaded, so we will see when they are able to review this.  Thank you!

 

Kevin R. Sorensen, SE

Streamline Engineering & Design, Inc.

8445 Sierra College Blvd., Suite E

Granite Bay, CA 95746

kevin@xxxxxxxxxxxxxxxxx

916.660.1930 (ph)

916.770.9267 (cell)

916.660.1941 (fax)

 

From: Jeremy Polak [mailto:jeremy.polak@xxxxxxxxxxxxxx]
Sent: Wednesday, October 04, 2023 6:17 AM
To: DAVID HURD <
davidchurd@xxxxxxx>
Cc: Kevin Sorensen <
Kevin@xxxxxxxxxxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>; Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>; David Bowen (Nokia) <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; James <James@xxxxxxxxxxxxxxxxx>; James Soares <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; Randal May (Nokia) <randal.may@xxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Thanks David, we will ensure we do not have conflict with your current scheduling.  

 

 



 

Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: DAVID HURD <davidchurd@xxxxxxx>
Date: Wednesday, October 4, 2023 at 8:09 AM
To: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>
Cc: Kevin Sorensen <
kevin@xxxxxxxxxxxxxxxxx>, Matt Jardin <mjardin@xxxxxxxxx>, Brian Ely <brianely@xxxxxxxxxxxxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James <James@xxxxxxxxxxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

Jeremy:

 

Once we have the DSA approval for the new changes, and you schedule the work accordingly, please be aware I do have to be on site as does the Testing Lab when you schedule the casting of that Monopole footing.  

 

I know you will want to do it ASAP as do I.

 

Therefore, I hope to avoid any conflict with other projects that I have with concrete being cast.  They are huge in comparison and also require my being present.  These days are already calendared and hopefully we can work around them, just for your one pour.

 

As it stands today, and always subject to adjustment:

 

I have a 100 yard pour, scheduled on, 10/10/23.

I have a 400 yard pour on, 10/13/23.

I have a 100 yard pour on, 10/17/23.

 

If there are any changes and we have not cast the Woodson Footing, I’ll up date you.

 

I trust there won’t be a conflict.

 

This is just an FYI and I trust I will be able to cover what I need too.

 

FYI

 

David C Hurd

 

 

On Oct 3, 2023, at 8:42 AM, Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx> wrote:



Kevin, these drawings look good, please move forward with submission to DSA for approval.

 

Thank you,

 

 



 

Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>
Date: Monday, October 2, 2023 at 10:12 AM
To: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>, Matt Jardin <mjardin@xxxxxxxxx>
Cc: Brian Ely <
brianely@xxxxxxxxxxxxxxxxx>, DAVID HURD <davidchurd@xxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James <James@xxxxxxxxxxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

All, please see the attached revised drawings.  Please review and approve and I will get these submitted to DSA if accepted.  Thank you!

 

Kevin R. Sorensen, SE

Streamline Engineering & Design, Inc.

8445 Sierra College Blvd., Suite E

Granite Bay, CA 95746

kevin@xxxxxxxxxxxxxxxxx

916.660.1930 (ph)

916.770.9267 (cell)

916.660.1941 (fax)

 

From: Jeremy Polak [mailto:jeremy.polak@xxxxxxxxxxxxxx]
Sent: Friday, September 29, 2023 12:26 PM
To: Kevin Sorensen <
Kevin@xxxxxxxxxxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>
Cc: Brian Ely <
brianely@xxxxxxxxxxxxxxxxx>; DAVID HURD <davidchurd@xxxxxxx>; Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>; David Bowen (Nokia) <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; James <James@xxxxxxxxxxxxxxxxx>; James Soares <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; Randal May (Nokia) <randal.may@xxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

 

Kevin, I have added the additional redlines for the grounding needs. Please review and let me know if you have any questions,

 



 

Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>
Date: Thursday, September 28, 2023 at 7:12 PM
To: Matt Jardin <
mjardin@xxxxxxxxx>, Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx>
Cc: Brian Ely <
brianely@xxxxxxxxxxxxxxxxx>, DAVID HURD <davidchurd@xxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James <James@xxxxxxxxxxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>
Subject: RE: RFI: Nokia Corning - Woodson Elementary School (Grounding)

Matt, I am still waiting for the response from Jeremy to approve our changes.  I will get this submitted to DSA within a day or two of that approval.

 

Jeremy, Please advise.

 

Kevin R. Sorensen, SE

Streamline Engineering & Design, Inc.

8445 Sierra College Blvd., Suite E

Granite Bay, CA 95746

kevin@xxxxxxxxxxxxxxxxx

916.660.1930 (ph)

916.770.9267 (cell)

916.660.1941 (fax)

 

 

 

From: Matt Jardin [mailto:mjardin@xxxxxxxxx]
Sent: Thursday, September 28, 2023 2:57 PM
To: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>
Cc: Brian Ely <
brianely@xxxxxxxxxxxxxxxxx>; DAVID HURD <davidchurd@xxxxxxx>; Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>; David Bowen (Nokia) <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; James <James@xxxxxxxxxxxxxxxxx>; James Soares <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>; Randal May (Nokia) <randal.may@xxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Do we have a time line when this is going back to DSA and the estimated response time?  It is going to start raining here and am guessing that will slow the project down even more.

 

Thank you

Matt

 

On Wed, Sep 27, 2023 at 10:53 AM Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx> wrote:

Kevin, disregard that last email, I didn’t see the arrow drawn up through the middle. I am going to have one more set of eyes look the drawings over to make sure nothing else is needed and get back with you today. Thank you,

 

 



 

Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx>
Date: Friday, September 22, 2023 at 10:16 AM
To: DAVID HURD <
davidchurd@xxxxxxx>, Matt Jardin <mjardin@xxxxxxxxx>
Cc: Brian Ely <
brianely@xxxxxxxxxxxxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James <James@xxxxxxxxxxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

All, the Red-Lines have been submitted to Kevin with Streamline Engineering and are now being reviewed by his firm. Kevin with be next to offer information back on this subject. I have included the redline submission for anyone to review as well as a picture illustrating an aspect of changes needed.

 

Thank you,

 

 



 

Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: DAVID HURD <davidchurd@xxxxxxx>
Date: Thursday, September 21, 2023 at 10:22 AM
To: Matt Jardin <
mjardin@xxxxxxxxx>
Cc: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>, Brian Ely <brianely@xxxxxxxxxxxxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James <James@xxxxxxxxxxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

Matt:

 

Not knowing the length of the bolts pictured, which are headed bolts, I would have to believe these bolts are not related to the anchor bolts shown at Detail 6/S-2.  Those bolts for the monopole footing at Woodson will need to  be much longer. 

 

The footing is 30” plus deep and those bolts will have to extend down to within 3” of the bottom of the footing above the soil and project up out of the footing enough to provide full nut threads attachment, plus adding the thickness of the base plate (2”) and allow also for 3” of grouting.  

 

They could be as much as 40” plus in length.   And greater in diameter at 1-1/4”.  

 

There are two (2), what what appear to be all thread rods, length unknown, inside the monopole sitting the past several months at the site.  Their length should be listed on the Testing Labs in plant bolt report.

 

If you want to know why we grout under base plates for these poles, outside light poles, etc., that can explained at another time.

 

FYI

David C Hurd

 

 

On Sep 21, 2023, at 7:36 AM, Matt Jardin <mjardin@xxxxxxxxx> wrote:



<IMG_8532.jpg>

 

 

On Thu, Sep 21, 2023 at 7:35 AM Matt Jardin <mjardin@xxxxxxxxx> wrote:

Good morning,

 

I would like to remind AO, that there was a pallet of bolts at the High School that we showed Shane while doing the inventory.  Are these the nuts and bolts you are referred by to?

 

 

 

On Thu, Sep 21, 2023 at 7:23 AM Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx> wrote:

Kevin/David, AOW is committed to providing the highest quality work and we take responsibility for any issues with the rebar construction. I will address the concerns outlined by David with the subcontractor to ensure our deliverable matches the construction drawings. In the meantime, Kevin appears to be working on the other issues I raised yesterday regarding the grounding and the security of the all-thread. I am attaching an image of another monopole installation we have done that includes a template plate on the top and bottom that maintains alignment of the vertical all-thread as well as the sub level concrete tension necessary to hold the all-thread in the concrete. I will redline both the grounding implementation as well as the structural improvement required for the monopole and have this to Kevin and his team today.

 

 

<image003.png>

 



 

Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: DAVID HURD <davidchurd@xxxxxxx>
Date: Wednesday, September 20, 2023 at 3:43 PM
To: Kevin Sorensen <
Kevin@xxxxxxxxxxxxxxxxx>
Cc: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>, James <James@xxxxxxxxxxxxxxxxx>, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>, Brian Ely <brianely@xxxxxxxxxxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>, Matt Jardin <mjardin@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

Not knowing how much experience the concrete contractor has with DSA projects and Streamline Engineering plans in placing concrete, here is one more reminder.

 

Have them pay attention to the Sheet S-1 Concrete Notes numbers 15, 16 & 17.

 

-All exposed edges are to receive 3/4” Chamfer strips

-All the Anchor Bolts are to securely positioned in place before placing concrete.  Use a template.  No wet setting.  Provide accurate projection with leveling nuts above the base plate for full nut threading and 3” of Non-Shrink grout between the bottom of the base plate and the footing pedestal.

-Have on hand before placing any concrete a properly sized motorized vibratory consolidator (stinger) to consolidate the concrete fully around the reinforcement and the anchor bolts. Pushing all the air bubble out.

 

Just trying to be helpful now and not having to point these things out later.

 

FYI

David C Hurd

 

 

On Sep 20, 2023, at 12:51 PM, Kevin Sorensen <kevin@xxxxxxxxxxxxxxxxx> wrote:



All, I need the GC to redline the latest approved CD drawings with any and all field changes completed so we can again review and determine if this is acceptable.  We will have to make additional revisions to the drawings and resubmit this additional CCD to DSA for approval once we determine the extent of the changes needed.  Thank you.

 

Kevin R. Sorensen, SE

Streamline Engineering & Design, Inc.

8445 Sierra College Blvd., Suite E

Granite Bay, CA 95746

kevin@xxxxxxxxxxxxxxxxx

916.660.1930 (ph)

916.770.9267 (cell)

916.660.1941 (fax)

 

 

 

From: DAVID HURD [mailto:davidchurd@xxxxxxx]
Sent: Wednesday, September 20, 2023 12:16 PM
To: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>
Cc: Kevin Sorensen <
Kevin@xxxxxxxxxxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>; Brian Ely <brianely@xxxxxxxxxxxxxxxxx>; David Bowen (Nokia) <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; James Soares <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>; Randal May (Nokia) <randal.may@xxxxxxxxx>; Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>
Subject: Re: RFI: Nokia Corning - Woodson Elementary School (Grounding)

 

Additionally, there appear to be another  change to the approved plans observed.  

 

The  upper portion or the pedestal that projects up out of the footing as the part that the monopole base plate sits 3” above, that has not been formed up yet.

 

Oer 7/S-2 the “Plate Detail”, that shows the pedestal portion to be 3” wider around at all sides.  Further out than the 21” base plate.  Which would make the pedestal 27” x 27”.

 

As fabricated it appears the contractor fabricated the reinforcement steel to be 36” x 36”, not 27” x 27”.

 

All this may be OK?   But, it is the Design Professional that decides if a Deviation from the approved plan is acceptable, or, if adjustments are to be made.

 

Run all this past Kevin Sorenson.  

 

Once the reinforcement steel deviations are resolved we wii inspect it again before you can pour.

 

FYI

David C Hurd

 

 

On Sep 20, 2023, at 10:45 AM, DAVID HURD <davidchurd@xxxxxxx> wrote:

Jeremy:

 

Your Concrete contractor has installed the reinforcement steel.  

 

Detail 6/S-2 calls for stirrups/ties to be #3 ties @ 3” O.C. vertically spaced. 

There 10 of them shown on the detail. 

 

Your contractor has used #7 rebar throughout and for the ties. They spaced the spaced them at about 7” O.C. as pictured below.

 

<image001.jpg>

 

<image005.jpg>

 

You will need approval from the SEOR for any rebar that does not follow the detail and deviates from the DSA approved Detail 6/S-2. 

 

Any change will also require a CCD to DSA because it is a change.

 

Therefore, before you cast any concrete, and, if you plan to leave the rebar as installed; you must get the design Professional, Kevin Sorenson approval for this change and subsequently DSA too.

 

According to MPR, 9/15/23, Reinforcement Inspection report there was no #3 rebar in the shipment for the Testing Lab to sample.

 

Please, provide at least a 48 hour notice to myself and the Testing Lab before you pour concrete into this footing.

 

FYI

 

David C Hurd

 

 

On Sep 20, 2023, at 9:24 AM, Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx> wrote:



Kevin, We have finished the rebar cage construction less the all-thread post insertion as this should be addressed before we proceed. We noticed there is no adequate grounding detail for the equipment and monopole as the CD’s indicate that we are to be installing a bus bar on the pole and another in the IDF and that would not work as the equipment would not be protected in the event of an electrical strike. The pole and its equipment really should be grounded in a similar manner as the other sites and that is to a grounding rod at the base of the pole. After speaking to Joe Wargo this morning, he suggests that this has a dual ground rod application, one on each side of the pad site away from the pole exothermically welded and contained in flex routed to emerge at the base of the pole before the slab pour. The 8’ rods would be inserted at the base of the pit. And fully inserted to natural earth and capped with the slab.

 

Please advise on how to proceed and suggest solutions that will be adequate to solve the issues at hand.

 

Thank you and have a great day,

 

 

 



 

Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>
Date: Wednesday, September 20, 2023 at 9:43 AM
To: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>, DAVID HURD <davidchurd@xxxxxxx>, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Cc: Brian Ely <
brianely@xxxxxxxxxxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>, Matt Jardin <mjardin@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>
Subject: RE: Corning Woodson Elementary sues

All, we will dig into this ASAP and get back to you on all of this.

 

Kevin R. Sorensen, SE

Streamline Engineering & Design, Inc.

8445 Sierra College Blvd., Suite E

Granite Bay, CA 95746

kevin@xxxxxxxxxxxxxxxxx

916.660.1930 (ph)

916.770.9267 (cell)

916.660.1941 (fax)

 

From: Jeremy Polak [mailto:jeremy.polak@xxxxxxxxxxxxxx]
Sent: Wednesday, September 20, 2023 7:24 AM
To: DAVID HURD <
davidchurd@xxxxxxx>; Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>; Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Cc: Brian Ely <
brianely@xxxxxxxxxxxxxxxxx>; David Bowen (Nokia) <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; James Soares <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>; Randal May (Nokia) <randal.may@xxxxxxxxx>; Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>
Subject: Re: Corning Woodson Elementary sues

 

Kevin, after speaking to Joe Wargo this morning, he suggests that this have a dual ground rod application, one on each side of the pad site away from the pole exothermically welded and contained in flex routed to emerge at the base of the pole before the slab pour. The 8’ rods would be inserted at the base of the pit. And fully inserted to natural earth and capped with the slab.

 

 


Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx>
Date: Wednesday, September 20, 2023 at 8:51 AM
To: DAVID HURD <
davidchurd@xxxxxxx>, Kevin Sorensen <kevin@xxxxxxxxxxxxxxxxx>, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Cc: Brian Ely <
brianely@xxxxxxxxxxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>, Matt Jardin <mjardin@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>
Subject: Corning Woodson Elementary sues

Good Morning Kevin,

 

David raised concern with the issue of there being missing detail outlining a double nut with washer application on the all-thread stud posts that would be submerged in the concrete. I recall you and I had a phone conversation when this issue was originally brought up and your response was that provided the nuts and washers were that of the metal detail on the CD’s, that we would be fine to add them to the application.

 

We have finished the rebar cage construction less the all-thread post insertion as this should be addressed before we proceed. Additionally, we noticed there is no adequate grounding detail for the equipment and monopole as the CD’s indicate that we are to be installing a bus bar on the pole and another in the IDF and that would not work as the equipment would not be protected in the event of an electrical strike. The pole and its equipment really should be grounded in a similar manner as the other sites and that is to a grounding rod at the base of the pole or in this case directly to the rebar cage would be even better.

 

Please advise on how to proceed and suggest solutions that will be adequate to solve the issues at hand.

 

Thank you and have a great day,

 

<image007.png>

 

 

 

 


Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 

 

From: DAVID HURD <davidchurd@xxxxxxx>
Date: Sunday, August 20, 2023 at 3:08 PM
To: Jeremy Polak <
jeremy.polak@xxxxxxxxxxxxxx>, Kevin Sorensen <kevin@xxxxxxxxxxxxxxxxx>, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Cc: Brian Ely <
brianely@xxxxxxxxxxxxxxxxx>, David Bowen (Nokia) <david.bowen@xxxxxxxxx>, Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>, Heather Igarta <higarta@xxxxxxxxx>, James Soares <james@xxxxxxxxxxxxxx>, Joe Wargo <wargo@xxxxxxxxxxxxxx>, czeno <czeno@xxxxxxxxxxxxxxxx>, Matt Jardin <mjardin@xxxxxxxxx>, Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>, Randal May (Nokia) <randal.may@xxxxxxxxx>, Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>
Subject: Re: Corning project - DSA 02-119832

Question: 

 

If what I am reading is telling us that OAW will be finishing up at Maywood Middle School and the Corning High School tomorrow,  Monday.  Who will be keeping us up to date with the status of the work while commissiong at those two site is being completed?  And what about the Woodson Elementary project?

 

Matt, Mid-Pacific Engineer (Testing Lab) and I will very much appreciate updates for any work that will be in progress at the Maywood Middle and the Corning High School   The same goes for all the remaining work to be done at the Woodson Elementary School.  Be it by OAW or Nokia.   We will need a contact person and their phone/email.and expect to be contacted and informed as required.

 

Thank you,

 

David C Hurd

 

\On Sunday, August 20, 2023 at 08:44:24 AM PDT, Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx> wrote:

 

 

GM

 

Thanks for the update. But the wiring diagram that was communicated was 0.5 not 0.4 so the deviation is due to not using the right version. 

 

On the RRH we will resolve it one way or another. 

 

Pls I request AOW to delivering the scope Nokia has purchased and let us Nokia  update from here onwards.  Nokia is handling the Commissioning and Acceptance of Corning next week w/o AOW. Pls take a note of it. 

 

We are still missing the Checklist documents we requested and we hope to have them on Monday COB. 

 

Nokia will update from here on the progress. 

 

Thanks for pushing the project forward. 

 

If you have any questions, please call me. 

 

 

Sean 

 


From: Jeremy Polak <jeremy.polak@xxxxxxxxxxxxxx>
Sent: Sunday, August 20, 2023 8:08:06 AM
To: Sean Ettehadieh (Nokia) <
sean.ettehadieh@xxxxxxxxx>; Kevin Sorensen <Kevin@xxxxxxxxxxxxxxxxx>; DAVID HURD <davidchurd@xxxxxxx>
Cc: Brian Ely <
brianely@xxxxxxxxxxxxxxxxx>; David Bowen (Nokia) <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; james <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; Matt Jardin <mjardin@xxxxxxxxx>; Gareth Rees (Nokia) <gareth.rees@xxxxxxxxx>; Randal May (Nokia) <randal.may@xxxxxxxxx>; Daniel Meersohn (Nokia) <daniel.meersohn@xxxxxxxxx>
Subject: Re: Corning project - DSA 02-119832

 

 

CAUTION: This is an external email. Please be very careful when clicking links or opening attachments. See the URL nok.it/ext for additional information.

 

Happy Weekend All,

 

Just wanted to bring everyone up to date with the most recent progress and expectations going forward. AOW has completed the week of 8/14 by bringing Maywood Middle School back to 95% completion. Per Nokia, azimuth angles were changed requiring a full dismount and reinstallation of the antennas. Cable management locks cabling into the exact length to reach the radios so any modification of position requires the cabling to be taken loose to accommodate additional lengths or to resecure any additional slack. All of this is to say time expired Friday to make the modifications needed before we had to vacate the premise. The district has sporting functions this weekend preventing progress and the inability to move the boom lift between schools means we will be back in Corning with a crew to finish Maywood on Monday. 

 

Nokia has similar requests at Corning HS so we will return once Maywood is complete (approx. 3 hours of work remaining) and make the needed adjustments to the azimuth angles, some house cleaning in the IDF and by EOD Monday, both schools will be positioned for acceptance and commissioning. Garreth from Nokia will be onsite to perform acceptance testing and confirm both schools are online and broadcasting.

 

Woodson Elem is still on hold as the district has a water sewage leak leaching into the monopole pad site that has yet to be approved for repair. In the meantime, Garreth was to bench program and test the Woodson BBU and radios however there was a switch up at some time prior to AOW involvement that pulled the 3 radios for Woodson and were used at another site. The original boxes were still onsite and had equipment inside. However, it was not the radios so at this time I do not believe Garreth will be able to effectively set up the mock system for bench testing.  Nokia is to proqure replacement radios for the future installation.

 

If anyone has questions or concerns, feel free to contact me or James who will be on site Monday.

 

 

 


Jeremy Polak
Project Manager
8708 S. Congress

Suite B-260

Austin, TX 78745
512-573-7771 direct
www.aowireless.com

 

 

 


From: Sean Ettehadieh (Nokia) <sean.ettehadieh@xxxxxxxxx>
Sent: Monday, August 14, 2023 5:55 PM
To: Kevin Sorensen <
Kevin@xxxxxxxxxxxxxxxxx>; DAVID HURD <davidchurd@xxxxxxx>
Cc: Brian Ely <
brianely@xxxxxxxxxxxxxxxxx>; David Bowen (Nokia) <david.bowen@xxxxxxxxx>; Ganesh Babu (Nokia) <ganesh.babu@xxxxxxxxx>; Heather Igarta <higarta@xxxxxxxxx>; James Soares <james@xxxxxxxxxxxxxx>; Joe Wargo <wargo@xxxxxxxxxxxxxx>; czeno <czeno@xxxxxxxxxxxxxxxx>; Jeremy Polak <

--
--
--
Please address private email -- email of interest to only one person -- directly to that person. That is, email your parts/car transactions and negotiations, as well as other personal messages, only to the intended recipient. Do not just press "reply" and send your email to everyone using the general '62-'65 Clubhouse public email address. This practice will protect your privacy, reduce the total volume of mail and fine-tune the content signal to Mopar topic. Thanks!
 
1962 to 1965 Mopar Clubhouse Discussion Guidelines:
http://www.1962to1965mopar.ornocar.org/mletiq.html and http://www.1962to1965mopar.ornocar.com/general_disclaimer.html.
--
You received this message because you are subscribed to the Google Groups "The 1962 to 1965 Mopar Mail List Clubhouse" group.
http://groups.google.com/group/1962to1965mopars?hl=en.
---
You received this message because you are subscribed to the Google Groups "The 1962 to 1965 Mopar Mail List Clubhouse" group.
To unsubscribe from this group and stop receiving emails from it, send an email to 1962to1965mopars+unsubscribe@xxxxxxxxxxxxxxxx.
To view this discussion on the web visit https://groups.google.com/d/msgid/1962to1965mopars/CBDCFC82-7DB0-4940-8539-ADEEFA2A5568%40aol.com.


Home Back to the Home of the Forward Look Network


Copyright © The Forward Look Network. All rights reserved.

Opinions expressed in posts reflect the views of their respective authors.
This site contains affiliate links for which we may be compensated.