Daily Project Reports

02-118784 - PHS Admin & Classrooms-
4/1/24 - No Work
4/2/24 - No Work
4/3/24 - No change. Contractor appears to be waiting to saw-cut around curbs prior to removal.
4/4/24 - Reported today, CCD-51 work is now postponed until Summer.

we received RFI

we received Response to RFI

02-119352 - Pine Ridge Elementary
Punch List work in progress. Today Landscape work is in progress. Gym Logo is in progress thru next Wednesday.

The Play Equipment footings need to dry out.

Still waiting on date from playground equipment installers.
Added:
-It is reported that Building A permanent stage work is pending.
-It is reported there are Casework changes at Classroom 2 and Classroom 3. Work is pending.
-There are to be reception desk changes. Work is pending.
-It is reported there will be classroom flooring changes, Vinyl tile and linoleum in lieu of carpet.
-They still have to schedule to grind of the asphalt and apply an overlay after the temp portables are removed. It is unknown when this will occur.

The updated punch list was received 4/5/24:

we received RFI

we received response to RFI we received the DSA approval for CCD 17.

02-119353 - Paradise Jr HS -
3/29/24 - Electricians working in the MP Building.
The Multipurpose room double doors will be set during Spring Break.

we received RFI

we received response to RFI

02-120568-New Science and Planetarium
Plumbers installing domestic water lines, waste and vent at Level 1, Area 3. HVAC ductwork, fan coils and air handlers are being hung at Level 1, area 3 and starting to install hangers Level 2, Area 3. Seismic bracing is being installed on hanging units at Level 1. Metal framing contractor is installing studs, trimmers and headers at Level 1, Area 1 and upper tracks at Level 2, Area 2. Electricians are working at the equipment yard switchgear and grounding the equipment. Districts side of the equipment yard MSB is grounded to the Ufer and ready District letter to PG & E. I also verified the electrical contractor check torque values at 35 Lbs in the bus bars. CT Concrete contractor cast the Planetarium Lobby deck and 10” overhang around the dome, the column at 9/B.7 and curbs at Level 1, Area 3, and along Line A.1 to 8/ B.8 and Line 7/B.6 to C.7 and the multi-gender restroom.

we received RFI

we received response to RFI received the DSA approval for CCD 35

02-120769 - Paradise HS Parking -
-The Switchgear is on order and waiting arrival late Spring or Summer of 2024.

JBB 2/16/24
-Asphalt is installed and painting ongoing.
-Lights in and not sure if power is connected yet.
-switch gear not installed yet.

we received RFI

we received response to RFI

02-121583 - Lassen View TK/K Classrooms

we received RFI 1 4/9/24.

we received response to RFI

David C Hurd

--
--
--
Please address private email -- email of interest to only one person -- directly to that person. That is, email your parts/car transactions and negotiations, as well as other personal messages, only to the intended recipient. Do not just press "reply" and send your email to everyone using the general '62-'65 Clubhouse public email address. This practice will protect your privacy, reduce the total volume of mail and fine-tune the content signal to Mopar topic. Thanks!
 
1962 to 1965 Mopar Clubhouse Discussion Guidelines:
http://www.1962to1965mopar.ornocar.org/mletiq.html and http://www.1962to1965mopar.ornocar.com/general_disclaimer.html.
--
You received this message because you are subscribed to the Google Groups "The 1962 to 1965 Mopar Mail List Clubhouse" group.
http://groups.google.com/group/1962to1965mopars?hl=en.
---
You received this message because you are subscribed to the Google Groups "The 1962 to 1965 Mopar Mail List Clubhouse" group.
To unsubscribe from this group and stop receiving emails from it, send an email to 1962to1965mopars+unsubscribe@xxxxxxxxxxxxxxxx.
To view this discussion on the web visit https://groups.google.com/d/msgid/1962to1965mopars/6297A6AB-0B77-47BB-89E3-68D9FCA4CB6C%40aol.com.

--
--
--
Please address private email -- email of interest to only one person -- directly to that person. That is, email your parts/car transactions and negotiations, as well as other personal messages, only to the intended recipient. Do not just press "reply" and send your email to everyone using the general '62-'65 Clubhouse public email address. This practice will protect your privacy, reduce the total volume of mail and fine-tune the content signal to Mopar topic. Thanks!
 
1962 to 1965 Mopar Clubhouse Discussion Guidelines:
http://www.1962to1965mopar.ornocar.org/mletiq.html and http://www.1962to1965mopar.ornocar.com/general_disclaimer.html.
--
You received this message because you are subscribed to the Google Groups "The 1962 to 1965 Mopar Mail List Clubhouse" group.
http://groups.google.com/group/1962to1965mopars?hl=en.
---
You received this message because you are subscribed to the Google Groups "The 1962 to 1965 Mopar Mail List Clubhouse" group.
To unsubscribe from this group and stop receiving emails from it, send an email to 1962to1965mopars+unsubscribe@xxxxxxxxxxxxxxxx.
To view this discussion on the web visit https://groups.google.com/d/msgid/1962to1965mopars/331274410.4859854.1712846894525%40mail.yahoo.com.


Home Back to the Home of the Forward Look Network


Copyright © The Forward Look Network. All rights reserved.

Opinions expressed in posts reflect the views of their respective authors.
This site contains affiliate links for which we may be compensated.